Storm drainage and Preventing Floods in yanbu pahse (2)
stormwater driangeTabnih Al Arabiya executed a project to develop an integrated water network along with the construction of an overhead tank with a capacity of 1,000 cubic meters in Al-Hulaifah village, located in Khamis Mushait Governorate. The project was commissioned by the Ministry of Environment, Water, and Agriculture, with a total value of USD 15,999,994.00.
The scope of the Storm Drainage and Flood Prevention Project in Yanbu – Phase (2) included the implementation of an integrated network consisting of main and secondary drainage lines, along with the construction of manholes connected to central treatment plants. The project was executed in accordance with the highest standards of quality and operational efficiency to ensure service sustainability and to enhance the environmental infrastructure of the area. Advanced technologies and specialized engineering supervision were employed to guarantee the readiness of the network and its capacity to effectively meet the demands of the growing population.